Barretts Elementary - COMPLETE
- Replace three rooftop HVAC units - COMPLETE
- Replace nine roof sections- COMPLETE
- Replace sidewalks, pavement and driveway to Dougherty Ferry Rd south of school- COMPLETE
-
Bellerive Elementary - COMPLETE
- Create full classrooms in areas 1500, 1600 and 1700 - COMPLETE
-
Carman Trails Elementary - COMPLETE
- Replace parking lots on south side of school - COMPLETE
-
Claymont Elementary - COMPLETE
- Replace main water line- COMPLETE
- Replace parking lot and driveway east of school- COMPLETE
- Replace exterior stairs leading to playground and north side of building- COMPLETE
- Replace two sidewalks- COMPLETE
-
Craig Elementary - Delayed to Bond Issue 2022
- Replace five rooftop exhaust fans
- Replace one rooftop HVAC unit
- Replace one roof section
- Replace two skylights with Solatubes
- Replace parking lot in front of building
- Replace paved play area behind school leading to main playground
-
Green Trails Elementary - SUMMER 2022
- Replace eight rooftop exhaust fans
- Replace one air intake damper and louver
- Replace two hot water boilers and four pumps
- Replace four rooftop HVAC units
- Replace main electrical switchboard
- Replace two roof sections
- Replace two skylights with Solatubes
-
Hanna Woods Elementary - COMPLETE
- Replace one roof section- COMPLETE
- Create individually securable classrooms- COMPLETE
-
Henry Elementary - Delayed to Bond Issue 2022
- Replace five rooftop HVAC units
- Replace four rooftop HVAC units and modify duct system
- Install fire sprinklers in two-story wing at back of the building
-
Highcroft Ridge Elementary - Delayed to Bond Issue 2022
- Replace two rooftop HVAC units
- Replace two main electrical switchboards
- Replace three sidewalks
-
Mason Ridge Elementary - COMPLETE
- Replace water boiler- COMPLETE
- Remove 28 condensing units and 28 heating/cooling ventilators and replace with individual HVAC units for each classroom- COMPLETE
- Replace 10 roof sections- COMPLETE
- Replace exterior stairs leading to parking lot on north side of building- COMPLETE
-
McKelvey Elementary - COMPLETE
- Replace rooftop HVAC unit- COMPLETE
- Replace paved play area north of building- COMPLETE
-
Oak Brook Elementary - SUMMER 2022
- Renovate nurse’s office/health area
-
Pierremont Elementary - Delayed to Bond Issue 2022
- Replace 10 rooftop HVAC units
- Replace three roof sections
-
River Bend Elementary - COMPLETE
- Replace main electrical switchboard- COMPLETE
- Replace electrical panelboard- COMPLETE
- Replace, reconfigure and expand parking lot- COMPLETE
- Replace paved pad on north side of building- COMPLETE
-
Ross Elementary - COMPLETE
- Replace 15 skylights- COMPLETE
- Replace driveway along north side of building- COMPLETE
- Replace exterior ramp leading from playground to upper field- COMPLETE
- Replace exterior ramps leading from cafeteria to handicap parking spaces- COMPLETE
- Replace exterior stairs leading from playground to upper field- COMPLETE
- Replace seven sidewalks- COMPLETE
-
Shenandoah Valley Elementary - COMPLETE
- Replace one electrical transformer- COMPLETE
- Replace 15 roof sections- COMPLETE
- Paint metal roof- COMPLETE
- Replace main driveway and parking lot in front of school- COMPLETE
- Replace two sidewalks- COMPLETE
-
Sorrento Springs Elementary- COMPLETE
- Replace 12 roof sections- COMPLETE
- Replace main parking lot and driveways in front of building- COMPLETE
- Replace driveway along south side of building- COMPLETE
-
Wren Hollow Elementary- COMPLETE
- Replace driveway behind building- COMPLETE
- Create individually securable classrooms- COMPLETE
-
Central Middle- COMPLETE
- Replace six rooftop HVAC units- COMPLETE
- Replace three rooftop HVAC units and modify duct system- COMPLETE
- Add three hot water boilers and three pumps- COMPLETE
- Replace nine exhaust fans- COMPLETE
- Replace main electrical switchboard- COMPLETE
- Replace three electrical transformers- COMPLETE
- Replace 11 roof sections- COMPLETE
- Widen main drive at N. Woods Mill Rd. to add left turn lane- COMPLETE
- Replace circle drive and parking lot in front of school- COMPLETE
- Add secure vestibule at main entrance with double-entry doors- COMPLETE
-
Northeast Middle - SUMMER 2022
- Replace four hot water boilers and two pumps
- Replace five rooftop HVAC units
- Install fire sprinklers in the 1994 addition to complete building sprinkler system
- Install addition and renovate nurse’s office/health area
- Add secure vestibule at main entrance with double-entry doors
- Replace exterior stairs leading to northwest entrance
- Replace four sidewalks
-
South Middle- COMPLETE
- Replace HVAC chiller- COMPLETE
- Replace two water pumps- COMPLETE
- Replace three rooftop HVAC units- COMPLETE
- Replace natural gas service- COMPLETE
- Replace domestic hot water boiler- COMPLETE
- Replace five roof sections- COMPLETE
- Replace main driveway leading to school and parking lot- COMPLETE
- Replace exterior stairs leading to east side of school, leading to south side of school, leading to west side of school- COMPLETE
- Addition and renovations for classrooms and Student Services with necessary modifications to parking lots and drives- COMPLETE
- Add secure vestibule at main entrance with double-entry doors- COMPLETE
-
Southwest Middle- COMPLETE
- Replace 19 rooftop exhaust fans- COMPLETE
- Replace 20 rooftop HVAC units- COMPLETE
- Replace eight roof sections- COMPLETE
- Replace nine skylights- COMPLETE
- Add secure vestibule at main entrance with double-entry doors- COMPLETE
- Replace main drive & circle drive in front of school & main parking lot- COMPLETE
-
West Middle- COMPLETE
- Replace roof sections- COMPLETE
- Replace main driveways- COMPLETE
- Replace and modify south paved play area- COMPLETE
- Replace concrete retaining wall west of school- COMPLETE
- Replace exterior ramps leading to soccer field, leading to south entrance, leading to and from west entrance- COMPLETE
- Add canopy to cover sidewalk leading from door to cafeteria- COMPLETE
- Add walls to enclose library including necessary HVAC modifications- COMPLETE
- Add secure vestibule at main entrance with double-entry doors- COMPLETE
-
Central High - SUMMER 2022
- Replace one interior HVAC unit
- Replace seven rooftop HVAC units and modify duct system
- Replace seven rooftop HVAC units
- Replace pool filtration system
- Replace seven roof sections
- Replace north parking lot
- Replace one sidewalk
- Add secure vestibule at main entrance with double-entry doors
-
Fern Ridge - SUMMER 2022
- Replace one rooftop HVAC unit
- Replace four roof sections
- Replace main electrical switchboard
- Replace electrical distribution board
- Renovate dual electrical service entrances into one service entrance
- Install additional electrical circuits to increase access to power in classrooms
- Replace ceilings and lighting in selected rooms
- Add secure vestibule at main entrance with double-entry doors
- Renovate science classroom
- Renovate existing administration area into two counselor offices
- Renovate nurse’s office/health area
-
North High - SUMMER 2022
DELAYED TO BOND ISSUE 2022
- Replace pool filtration tank
- Replace three electrical panelboards
- Replace five electrical transformers
- Replace stadium field lighting
- Replace exterior stairs leading to north side of building, leading to west side of building from west parking lot and leading to track
- Install addition for FACS and part of SSD
- Renovate existing FACS into main administrative and reception area
- Install addition to the west courtyard for new main entry and secure reception area which will include a new elevator connecting the lower level drama area, main floor and the second floor
- Connect north and west parking lots
SUMMER 2022
- High School Storm Shelter
- Tennis Court Relocation
-
South High - SUMMER 2022
- Replace two interior HVAC units and modify duct system to provide air conditioning for Gym C
- Replace pool filtration system
- Replace emergency electrical generator
- Replace five main electrical switchboards
- Replace nine electrical panelboards
- Replace three electrical transformers
- Replace two roof sections
- Replace driveway leading from south parking lot to Southwest Middle
- Replace exterior two sets of stairs leading to south entrance of school and two sets leading to east entrance of school
- Replace two sidewalks
- Replace bleacher seats in main gym
- Add secure vestibule at main entrance with double-entry doors
-
West High - SUMMER 2022
- Replace three rooftop HVAC units
- Replace seven interior HVAC units and modify duct system
- Replace two chillers
- Replace cooling tower
- Replace two chilled water pumps
- Replace pool dehumidification unit
- Replace one condensing unit
- Replace four main electrical switchboards
- Replace two electrical panelboards
- Replace 16 electrical transformers
- Replace one roof section
- Renovate fine arts area
- Replace paved loading area east of school
- Replace exterior stairs leading to south side of school, north side of school leading to and from east side of school
- Renovate locker bay area on 3rd floor to construct additional classrooms
- Add secure vestibule at main entrance with double-entry doors- COMPLETE
-
Early Childhood - SUMMER 2022
- Replace two rooftop exhaust fans
- Replace electrical panelboard
- Renovate nurse’s office/health area
- Replace two electrical transformers
- Replace two roof mounted exhausts
- Replace two hot water boilers and four pumps
- Replace wood retaining wall on east side of the building
- Replace main parking lot on west side of school
- Install fire sprinklers in the entire building
-
Instructional Services Center (McKelvey Primary Center)- COMPLETE
- Renovate ISC to be a primary center for McKelvey including HVAC plumbing and electrical as required, to provide 17 classrooms, plus three full-size special instruction, music and art classrooms - COMPLETE
-
Transportation, Operations, Facilities and Administration - Delayed to Bond Issue 2022
- Replace one HVAC unit (Administration)
- Replace wood retaining wall on the south side of the building
- Replace exterior stairs leading to main entrance from parking lot
- Replace sidewalk leading to main entrance of building
- Replace sidewalk
- Replace three HVAC units
- Replace one electrical panelboard
- Replace two HVAC units
- Replace one lighting panelboard
- Replace one roof section
- Replace exterior stairs connecting southwest bus lots
-
District-Wide projects - ONGOING
- Ongoing ADA accessibility projects to improve accessibility for individuals with disabilities
- Ongoing replacement of damaged or failing interior and exterior doors, frames and hardware to meet code requirements
- Masonry tuckpointing, exterior joint caulking, sealing plaster at Barretts, Bellerive, Henry, Mason Ridge, South Middle, North High and Administration
- Ongoing replacement of broken, dam or uninsulated windows
- Ongoing replacement of worn floor coverings
- Replacement of worn stadium athletic fields & resurface worn running tracks at high schools - COMPLETE (PIC)
- Ongoing replacement of wood gym floors and bleachers
- Renovate libraries at all five middle schools- COMPLETE
- Complete keying system security upgrade to replace door hardware on non-classroom rooms that can be locked from inside
- Ongoing installment of future instructional technology needs for classrooms such as audio/visual equipment
- Double the amount of security cameras at each elementary school to expand coverage- COMPLETE
- Ongoing restroom renovations
- Sustainability projects: South High Geothermal field and chillers- COMPLETE
- Replace current analog phone system with a digital network system- COMPLETE
- Add intruder-resistant safety film to identified secondary entrances and windows.