Carman Trails Elementary
Prop S: What was funded for my school?
- Build safe and accessible playgrounds
- Replace 10 roof sections
- Replace three sections of pavement
- Replace one exterior ramp
- Replace seven sections of sidewalk
- Replace 10 exterior doors
- Removal of asbestos floor, ceiling and wallboards
- Improve ADA accessibility in cafeteria
- Replace aging classroom technology (interactive flat panels)
Across the District
Safety and Security
- Security camera upgrades
- Add fire sprinkler systems for safety and to meet building/fire safety codes
- Asbestos abatement
Technology
- Replace aging classroom technology (interactive flat panels)
- Add secondary internet connection for emergency disaster recovery
- Redesign district fiber network to avoid internet outages and disruption to learning
- Upgrade districtwide technology network (equipment refresh, wireless, backup power, cooling for data closets)
Accessibility
- ADA Projects to support students, staff and community members with disabilities, including ramps, sidewalks, curbs, elevators and replacing stairs to remove access barriers
- Replace old elementary and preschool playgrounds to ensure safety and accessibility for all students
Capital replacement projects
- Replace old heating/cooling units to improve air quality and efficiency
- Replace leaky, old roofs
- Ongoing restroom renovations
- Replace old doors and windows
- Pavement updates (parking lots, sidewalks, ramps and stairs)
- Update old electrical and plumbing