Skip To Main Content

Craig Elementary

Craig Elementary (Built 1967) PROPOSED PROJECTS

Projects funded by the 2022 bond issue (view project tracker here)

 

Prop S: What was funded for my school?

  • Build safe and accessible playgrounds
  • Install fire sprinkler system
  • Replace four exhaust fans and gas-fired rooftop HVAC unit
  • Replace seven exhaust fans and 12 rooftop HVAC units
  • Replace interior lighting and ceilings
  • Replace eight sections of parking lot
  • Replace six sections of sidewalk
  • Replace storm water drain line
  • Replace 12 exterior doors
  • Removal of asbestos floor, ceiling and wallboards
barretts students

Across the District

Safety and Security

  • Security camera upgrades
  • Add fire sprinkler systems for safety and to meet building/fire safety codes
  • Asbestos abatement

Technology

  • Replace aging classroom technology (interactive flat panels)
  • Add secondary internet connection for emergency disaster recovery
  • Redesign district fiber network to avoid internet outages and disruption to learning
  • Upgrade districtwide technology network (equipment refresh, wireless, backup power, cooling for data closets)

Accessibility

  • ADA Projects to support students, staff and community members with disabilities, including ramps, sidewalks, curbs, elevators and replacing stairs to remove access barriers
  • Replace old elementary and preschool playgrounds to ensure safety and accessibility for all students

Capital replacement projects

  • Replace old heating/cooling units to improve air quality and efficiency
  • Replace leaky, old roofs
  • Ongoing restroom renovations
  • Replace old doors and windows
  • Pavement updates (parking lots, sidewalks, ramps and stairs)
  • Update old electrical and plumbing