Early Childhood Center

Early Childhood Center (Built 1971) 

Projects funded by the 2022 bond issue (view project tracker here)

 

Prop S: What was funded for my school?

  • Build safe and accessible playgrounds
  • Build a secondary Early Childhood Center location
  • Replace two sections of parking lot, seven sections of sidewalks and two ramps
  • Replace 32 windows
  • Removal of asbestos floor, ceiling and wallboards
  • Replace the accordion doors for four new student therapy rooms
  • Replace retaining walls
  • Add storm water surface drainage and retention basins
barretts students