Early Childhood Center
Early Childhood Center (Built 1971)
Projects funded by the 2022 bond issue (view project tracker here)
Prop S: What was funded for my school?
- Build safe and accessible playgrounds
- Build a secondary Early Childhood Center location
- Replace two sections of parking lot, seven sections of sidewalks and two ramps
- Replace 32 windows
- Removal of asbestos floor, ceiling and wallboards
- Replace the accordion doors for four new student therapy rooms
- Replace retaining walls
- Add storm water surface drainage and retention basins