North High

North High (Built 1971) 

Projects funded by the 2022 bond issue (view project tracker here)

 

Prop S: What was funded for my school?

  • Recondition old pool
  • Renovate locker rooms
  • Complete fire sprinkler system
  • Replace electrical switchboard
  • Replace and add stadium visitor bleachers
  • Caulk and seal building aggregate panels
  • Replace 51 exterior windows
  • Removal of asbestos floor, ceiling and wallboards
  • Renovate existing FACS into main administration and reception area
  • Addition of FACS and SSD rooms
  • Add west courtyard for new main entry with security vestibule
  • Add an elevator for ADA
  • Connect north and west parking lots
  • Renovate kitchen and kitchen flooring
north high students

Across the District

Safety and Security

  • Security camera upgrades
  • Add fire sprinkler systems for safety and to meet building/fire safety codes
  • Asbestos abatement

Technology

  • Replace aging classroom technology (interactive flat panels)
  • Add secondary internet connection for emergency disaster recovery
  • Redesign district fiber network to avoid internet outages and disruption to learning
  • Upgrade districtwide technology network (equipment refresh, wireless, backup power, cooling for data closets)

Accessibility

  • ADA Projects to support students, staff and community members with disabilities, including ramps, sidewalks, curbs, elevators and replacing stairs to remove access barriers
  • Replace old elementary and preschool playgrounds to ensure safety and accessibility for all students

Capital replacement projects

  • Replace old heating/cooling units to improve air quality and efficiency
  • Replace leaky, old roofs
  • Ongoing restroom renovations
  • Replace old doors and windows
  • Pavement updates (parking lots, sidewalks, ramps and stairs)
  • Update old electrical and plumbing