Northeast Middle

Northeast Middle (Built 1972) 

Projects funded by the 2022 bond issue (view project tracker here)

Prop S: What was funded for my school?

  • Add emergency internet connection for disaster recovery
  • Replace six rooftop HVAC units
  • Replace six sections of parking lot and drives
  • Replace 12 roof areas
  • Replace sanitary waste line
  • Renovate boys' locker room to choir area
  • Security camera upgrades
  • Replace aging classroom technology (interactive flat panels)
  • Upgrade districtwide technology
  • Redesign district fiber network to avoid internet outages
northeast middle students

Across the District

Safety and Security

  • Security camera upgrades
  • Add fire sprinkler systems for safety and to meet building/fire safety codes
  • Asbestos abatement

Technology

  • Replace aging classroom technology (interactive flat panels)
  • Add secondary internet connection for emergency disaster recovery
  • Redesign district fiber network to avoid internet outages and disruption to learning
  • Upgrade districtwide technology network (equipment refresh, wireless, backup power, cooling for data closets)

Accessibility

  • ADA Projects to support students, staff and community members with disabilities, including ramps, sidewalks, curbs, elevators and replacing stairs to remove access barriers
  • Replace old elementary and preschool playgrounds to ensure safety and accessibility for all students

Capital replacement projects

  • Replace old heating/cooling units to improve air quality and efficiency
  • Replace leaky, old roofs
  • Ongoing restroom renovations
  • Replace old doors and windows
  • Pavement updates (parking lots, sidewalks, ramps and stairs)
  • Update old electrical and plumbing