Summary of Projects Funded by Proposition S 2022

Capital replacement, maintenance and repairs – keeping students safe, dry and warm: $133,772,000

  • Heating, ventilation and air conditioning to improve air quality and efficiency 
  • Heating and cooling automation to increase energy efficiency and sustainability
  • Security camera upgrades for improved safety and security 
  • Add fire sprinkler systems for safety and to meet building/fire safety code
  • Doors and windows
  • Pavement (parking lots, drives, sidewalks, ramps and exterior stairs)
  • Roofing
  • Electrical power and lighting
  • Plumbing  
  • Asbestos abatement    
  • Exterior walls         
  • Flooring         
  • Retaining walls, drainage and water retainage
  • Asphalt patching and sealing
  • Energy reduction/generation

Technology – keeping students connected to learning: $38,520,000

  • Replace aging classroom technology (interactive flat panels)
  • Add secondary internet connection for emergency disaster recovery
  • Redesign district fiber networks across the 68 square-mile district (bury the fiber network in-ground) to avoid outages and disruption to internet connection and instruction
  • Upgrade districtwide technology network (equipment refresh, wireless, backup power, cooling for data closets)

Ensuring accessibility for all students: $6,278,000

  • Projects to support students, staff and community members with disabilities including ramps, sidewalks, curbs, elevators and replacing stairs to remove access barriers

Safe and accessible elementary and preschool playgrounds: $9,585,000

  • Replace old elementary and preschool playgrounds to ensure safety and accessibility for 
    all students

Classrooms, restrooms, cafeterias, early childhood and athletics: $76,845,000

  • Classroom addition to River Bend Elementary and storm shelter (required building code)
  • Add four student therapy rooms at the current Early Childhood Center
  • Renovate old restrooms districtwide
  • Recondition four old high school pools
  • Renovate aging locker rooms at four high schools
  • Renovations to North High to complete phase two of the master plan
  • Construct a second Early Childhood Center location to meet the increasing need for early childhood and preschool programs which exceeds our current capacity
  • Update kitchen and cook area at North High to meet health standards
  • Update kitchen and cafe at Central High consistent with other schools

NO-TAX-RATE-INCREASE BOND ISSUE: $265,000,000