Prop S: What was funded for my school?

    • Build safe and accessible playgrounds
    • Build a secondary Early Childhood Center location
    • Replace two sections of parking lot, seven sections of sidewalks and two ramps
    • Replace 32 windows
    • Removal of asbestos floor, ceiling and wallboards
    • Replace the accordion doors for four new student therapy rooms
    • Replace retaining walls
    • Add storm water surface drainage and retention basins
barretts students