Prop S: What was funded for my school?

    • Build safe and accessible playgrounds
    • Replace two roof sections
    • Replace pavement in play area
    • Replace four sections of sidewalk
    • Replace track surface
    • Replace 11 exterior doors
    • Replace three windows
    • Removal of asbestos floor, ceiling and wallboards
barretts students
  • Across the District

    Safety and Security

    • Security camera upgrades
    • Add fire sprinkler systems for safety and to meet building/fire safety codes
    • Asbestos abatement

    Technology

    • Replace aging classroom technology (interactive flat panels)
    • Add secondary internet connection for emergency disaster recovery
    • Redesign district fiber network to avoid internet outages and disruption to learning
    • Upgrade districtwide technology network (equipment refresh, wireless, backup power, cooling for data closets)

    Accessibility

    • ADA Projects to support students, staff and community members with disabilities, including ramps, sidewalks, curbs, elevators and replacing stairs to remove access barriers
    • Replace old elementary and preschool playgrounds to ensure safety and accessibility for all students

    Capital replacement projects

    • Replace old heating/cooling units to improve air quality and efficiency
    • Replace leaky, old roofs
    • Ongoing restroom renovations
    • Replace old doors and windows
    • Pavement updates (parking lots, sidewalks, ramps and stairs)
    • Update old electrical and plumbing