Prop S Project Tracker
Page Navigation
- Home
- Summary of Projects
-
Projects by School
- Barretts Elementary
- Bellerive Elementary
- Carman Trails Elementary
- Claymont Elementary
- Craig Elementary
- Early Childhood Center
- Green Trails Elementary
- Hanna Woods Elementary
- Henry Elementary
- Highcroft Ridge Elementary
- Mason Ridge Elementary
- McKelvey Primary & Intermediate
- Oak Brook Elementary
- Pierremont Elementary
- River Bend Elementary
- Ross Elementary
- Shenandoah Valley Elementary
- Sorrento Springs Elementary
- Wren Hollow Elementary
- Central Middle
- Northeast Middle
- South Middle
- Southwest Middle
- West Middle
- Central High
- North High
- South High
- West High
- Fern Ridge
- New Early Childhood Center South Area
-
Highcroft Ridge Elementary (Built 1978)
Projects funded by the 2022 bond issue (view project tracker here)
Prop S: What was funded for my school?
-
- Build safe and accessible playgrounds
- Install fire sprinkler system
- Replace six roof sections and one skylight
- Replace main electrical switchboard
- Replace eight sections of parking lot and driveway
- Replace six sections of sidewalk
- Removal of asbestos floor, ceiling and wallboards
- Replace two electric rooftop HVAC units
- Replace track surface
- Replace 16 exterior doors
- Replace 11 windows
- Improve ADA accessibility in the cafeteria
-
Across the District
Safety and Security
- Security camera upgrades
- Add fire sprinkler systems for safety and to meet building/fire safety codes
- Asbestos abatement
Technology
- Replace aging classroom technology (interactive flat panels)
- Add secondary internet connection for emergency disaster recovery
- Redesign district fiber network to avoid internet outages and disruption to learning
- Upgrade districtwide technology network (equipment refresh, wireless, backup power, cooling for data closets)
Accessibility
- ADA Projects to support students, staff and community members with disabilities, including ramps, sidewalks, curbs, elevators and replacing stairs to remove access barriers
- Replace old elementary and preschool playgrounds to ensure safety and accessibility for all students
Capital replacement projects
- Replace old heating/cooling units to improve air quality and efficiency
- Replace leaky, old roofs
- Ongoing restroom renovations
- Replace old doors and windows
- Pavement updates (parking lots, sidewalks, ramps and stairs)
- Update old electrical and plumbing